|
Product Detail :
|
Construction of Elevated structures (Metro Viaduct, Rail cum Road Flyover & Stations) for a length of 6.521 Km excluding JP Nagar 4th Phase station from Ch -0.330 Km to Ch +6.326 Km and 4 Nos of Elevated Double Decker Metro Stations (central portion) viz. JP Nagar 5th Phase, JP Nagar, Kadirenahalli and Kamakya Junction including Normal Viaduct for a length of 826m and Rail cum Road Flyover for a Length of 5695m, Loops and Ramps, Demolition of Dollars Colony Junction Flyover, Road widening, Utility diversion and other allied works of Bengaluru Metro Rail Project, Phase 3.
|