Product Detail :
|
SCR Construction Organization - Engineering, Procurement and Construction (EPC) - Contract for "Construction of New Bi-Directional Twin Tunnels on diversion (1) Main Tunnel of 6.70 Km long each (6.05 Km Main Tunnel length + 0.65 Km Main Cut & Cover length and 1.8 Km approach length for Main Tunnel) (2) Evacuation Tunnel of 6.70 Km long each (6.05 Km Evacuation Tunnel length + 0.65 Km Evacuation Cut & Cover length and 1.8 Km approach length for Evacuation Tunnel) , total 8.5 Kms length including approaches on BLT and other allied works between Usarani-Jamod stations from Km 669.000 to Km 677.500 of Akot - Amlakhurd Section in connection with Akola-Khandwa Gauge Conversion Project in Nanded Division of South Central Railway.
|
Tender Detail : |
Scr Construction Organization - Engineering, Procurement and Construction (epc) - Contract For
"construction of New Bi-directional Twin Tunnels on Diversion (1) Main Tunnel of 6.70 Km Long Each
(6.05 Km Main Tunnel Length + 0.65 Km Main Cut & Cover Length and 1.8 Km Approach Length For
main Tunnel) (2) Evacuation Tunnel of 6.70 Km Long Each (6.05 Km Evacuation Tunnel Length + 0.65
km Evacuation Cut & Cover Length and 1.8 Km Approach Length for Evacuation Tunnel) , Total 8.5
kms Length Including Approaches on Blt and Other Allied Works Between Usarani-jamod Stations From
km: 669.000 to Km: 677.500 of Akot - Amlakhurd Section in Connection with Akola-khandwa Gauge
conversion Project in Nanded Division of South Central Railway" |