|
Product Detail :
|
SUPPLY AND SERVICES FOR R-R SECTION RR Lumpsum Supply, RR Lumpsum Services, RR Mob Demob, ERECTION&DSMNTLNGOF CONVENTIO, ERECTION&DSMNTLNGOF SCAFFOLDI, SPDNG OR DE-SPDNG OR GASKET R, REMOVAL&INSTALLATION,F/F LNGD VLV, RPLCMNT,OF THREADED VLVS,NIPP, THREADING,OF PIPE UPTO 2IN DI, ASSISTANCE,OF SKILLED MANPOWE, ASSISTANCE,OF SEMISKILLED MAN, ASSISTANCE,OF UNSKILLED MANPO, RPLCMNT,OF STRUCTURAL WORK W, RPLCMNT,OF NEW STRUCTURAL WOR, RPLCMNT,OF STRUCTURAL WORK W, RPLCMNT,OF GRATINGS/PLATES W, INSTLTN,OF NEW GRATINGS/PLATE, FBRCT,MTRL SPLD,F/STRUCTURAL RE, REMOVAL,OF OBSOLETE STRUCTURE, ABRASIVECU-SLAGBLAST CLNG, AIRLESS SPRAY,OF PRIMER,INORG, BRUSH PAINTING,OF SELF-PRIMIN, CLNG,POWER TOOL CLNG,AT UNIT, HAND TOOL CLNG,AT UNIT AREA, SRVC,F/6MM THK CS FILLET WLDN, SRVC,F/6MM THK CS BUTT WLDNG,, SRVC,F/6MM THK CS PLATE GAS C, GRINDING/BUFFING,PLATE ANY META, GRINDING,OF SS PLATE / PIPE P, PIPE BENDING/COLD ROLLING,OF , SRVC,F/TEMPORARY PPNG WLD JNT, SRVC,F/CS PPNG SOCKET WLD JNT, SRVC,F/BUTT WLD JNT,ALL SCH,C, SRVC,F/CS/KCS CRSN PAD ALL SI, SRVC,F/CS/KCS STL RNFRCMNT PA, SRVC,F/CS/KCS MITRE,OF ALL SI, SRVC,F/CS/KCS STL SHOE SUPPOR, SRVC,F/SOCKET WLD JNT,ALL SCH, SRVC,F/BUTT WLD JNT,ALL SCH,S, PERIN DIA,OF IBR WLDED JNTS F, SRVC,F/SS/AL STL SHOE SUPPOR, SRVC,F/SS/AL STL RNFRCMNT PAD, SS/AL STL MITRE,, OF ALL SIZES, SRVC,F/SS/AL STL CRSN PAD, SRVC,F/DSS PIPE WLDNG FILLET , SRVC,F/DSS PIPE WLDNG BUTT WL, UNPLUGGING,OF STEAM JCKTD PPN, SRVC,F/CS JCKTD PPNG WLD JNT,, REMOVAL,OF OBSOLETE PIPE,ALL , SRVCCEMENT LINED PPNG,F/WLD J, SERVICE,WELD JOINT,CEMEN T LINED PIPNG, CEMENT LINING,OF ELBOW/TEE/, CRSN PROTECTION,OF PIPELINES,, CRSN PROTECTION,OF PIPELINES,, CRSN PROTECTION,OF PIPELINES,, FBRCTN N INSTLTN,OF SLV,F/UND, SRVC,F/CS INLAY PATCHES,10MM , SRVC,F/AS/SS INLAY PATCHES,10, SRVC,F/CS OVERLAY PATCHES,6MM, SRVC,F/OVERLAY PATCH JOB-3MM , RPLCMNT,OF NOZZLES/MANHEADS F, Hydrotesting of Pipe lines, Radiography - 3" / 4" wide film, WFMP Test, SRVC,F/CS WLD DPSTION,3MM THK, SRVC,F/AS/SS WLD DPSTION,3MM , SRVC,F/MNL WLD DPSTION,3MM TH, SRVC,F/3MM THK WLD DPSTION,DS, SRVC,F/MNL FILLET WLDNG,3MM T, SRVC,F/3MM THK FILLET WLDNG-N, SRVC,F/MNL BUTT WLDNG,3MM THK, WELD BULD UP,W/STLT ELCT RDS,RT PYBL/3 MM, RPR WORK,F/CRACK USING MAGNA , Dye Penetrant (DP) Test, HYDROGEN DIFFUSION,OF JNTS AL, STRESS RELIEVING,OF WLD JNTS, HYDROGEN DIFFUSION,F/SURFCS, SRVC,F/WLDNG OF CS ANCHORS, SRVC,F/WLDNG OF SS ANCHORS, SRVC,F/CASTABLE REFRACTORY JO, GUNNITING,OF REFRACTORY -THKN, GUNNITING,OF REFRACTORY -THKN, FBRCTN&SPLY,OF CS/LOW AL STL, FBRCTN&SPLY,OF SS304/SS304H/S, RPRING/RPLCMNT,OF REFRACTORY, CERAMIC FIBRE BLANKET LINING,, RPLCMNT,OF CERAMIC FIBRE MODULE,RATE PER, RPLCMNT,OF CS/AL STL/SS FRNC TUBE INSITU, WLDNG,OF TST SENSOR PROBE,W/T, HYDRO TEST,F/EACH PASS OF HEA, RPLCMNT,OF CMPLT TUBE HANGER , RPLCMNT,OF TUBE SUPPORT KEEPE, RPR/RPLCMNT,OF SS PERFORATED , RPR WORK,F/EXCHANGER/CONDE NSE, RPR WORK,F/EXCHANGER/CONDE NSE, RPR WORK,F/EXCHANGER/CONDE NSE, RPLCMNT,OF ANODE PLATE,UP TO , RPLCMNT,OF ANODE PLATE,ABOVE , RPLCMNT,OF ANODE PLATE,ABOVE , FIXING,OF BLOWN-OUT PLUGS UPT, HYDROBLASTING,OF EXCHANGER TU, MECHANICAL CLNG,OF EXCHANGER , RETUBING,OF TUBE BUNDLE PER T, ASSY,OF TUBE BUNDLE W/OUT WLD, ASSY,OF TUBE BUNDLE W/WLDNG P, SEAL WLDNG,CS TUBE,F/EXCHANGE, SEAL WLDNG,F/EXCHANGER/AFC TU, Repeat Ring Test /Shell Test/Tube Test O, SRVC,F/AFC PLUGS OPNG&TIGHTEN, ROLLING,OF LEAKING EXCHANGERS, Vacuum Testing of Exchanger / AFC Tubes, SPLY,OF DIESEL HYDROBLASTING , CALIBRATION,OF SPRNG HANGERS , IN-SITU MACHINING,UP TO 12 IN, IN-SITU MACHINING,ABOVE 12 IN, SRVC,F/EX-SITU MACHINING IN V, Hiring Charges for Hydraulic Torque Wren, Hiring Charges for Hydraulic Torque Wren, RPLCMNT,OF CS WLDED TRAY SECT, RPLCMNT,OF SS WLDED TRAY SECT, RPLCMNT,OF TRAY/GRID SUPPORT , RPLCMNT,OF BOLTED TRAY SECTIO, FBRCTN,OF TRAY/GRID SUPPORT B, RPLCMNT,OF SS STRIPLINING OF , RPLCMNT,OF PLUGS/GASKETS OF A, Repeat Hydro Test of AFC, SERVICING&FREEING UP,OF VLVS , SERVICING&RPRS,OF ALL VLVS BY, ALUMINIUM SHEETSPLY N APPLIC, REMOVAL,OF INSULATION LAPPED, SRVC,F/HOT INSULATION OF LINE, CLADDING,OF LINES W/ALUMINIUM, CLADDING,OF LINES W/GALVANIZED IRON SHEE, CLADDING,OF LINES W/SS 304/316 SHEET, SPLY,OF CS/LOW AL STL/SS410/S, SPLY,OF SS304/SS304H/SS316/SS, CLNG,OF STRAINER, LVL GAUGE SERVICING. RATE PAY, BARRICADING,USING ASBESTOS/GI, EXCAVATION&BACKFILLING,O F SOI, EXCAVATION&BACKFILLING,O F PCC, EXCAVATION&BACKFILLING,O F RCC, DEWATERING PMP OPERATION PERS, SPY&APLCTN,PAINTING,ONE COAT OF PRIMER, CS WLDNG,F/CRACKS WLDNG/WLDNG, SS WLDNG,F/CRACKS WLDNG/WLDNG, UNLOADING,OF CATALYST/ALUMINA, CLNG,OF VESSEL N LOADING OF N, DSMNTLNG,SERVICING N RE-FIXIN, SERVICING,OF SPRNG HANGERS/SU, RPLCMNT,OF SPRNG HANGERS/SUPP, SRVC,F/HOT TAP ON CS LINEALL , RPR WORK,F/TNK BOTTOM PLATE,O, RPR WORK,F/TNK BOTTOM PLATE,A, RPR WORK,F/TNK BOTTOM PLATE,S, RPR WORK,F/TNK BOTTOM PLATE/A, RPR WORK,F/TNK BOTTOM PLATE/W, TNK ROOF RPR,OVERLAY PATCHF/M, TNK ROOF RPR,SECTIONAL/FULL P, TNK ROOF RPR,6MM FILL
|