Product Detail :
|
Construction of left bank canal from various km including all structures. canal works excavation of all kinds of soils/disintegrated rock/medium hard rock/hard rock. structure works water conveyance system by rectangular triple vent conduit, village road bridge 6 nos, cross drainage/super passage works 7 nos, existing canal crossing cum village bridge 1 no.
|