Product Detail :
|
Work of Design, Engineering, fabrication, installation and rectification of damaged coal inlet chutes of Conveyor 101, 102, 103 and discharge transfer chute of Conveyor 101A, 101B to 102A and 102B in Modular form with Sinter Silicon Carbide at CHP-D, CSTPS. Annual Work Contract for Loading of coal into wagons and transportation of coal from discharge terminal of ARW of CHP-A and coal loading ramp of CHP-C to track hopper of CHP-C, CSTPS. Work of repairing/reconditioning of power transmission assemblies in CH P-D CSTPS. Work for removal of accumulated sludge, debris and foreign material from condenser pits located at Turbine basement Unit-8 . Unit-9, CSTPS.
|